<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/"><channel><title>Contracts | Conshy Roofers</title><link>https://conshyroofers.com/tag/contracts/</link><description>Contracts on Conshy Roofers</description><language>en-us</language><atom:link href="https://conshyroofers.com/tag/contracts/index.xml" rel="self" type="application/rss+xml"/><lastBuildDate>Mon, 19 Oct 2026 08:39:44 -0400</lastBuildDate><item><title>Conshohocken's roof permit addendum asks 12 questions that a roofing quote should answer line by line</title><link>https://conshyroofers.com/2026/10/19/reading-roofing-quote-line-by-line/</link><pubDate>Mon, 19 Oct 2026 08:39:44 -0400</pubDate><guid isPermaLink="true">https://conshyroofers.com/2026/10/19/reading-roofing-quote-line-by-line/</guid><category>Guide notes</category><description>On an $18,000 example re-roof, Conshohocken's fee schedule puts the building permit at $224.50 and state law caps the deposit at $6,000.</description><content:encoded>&lt;p&gt;Conshohocken requires a Roof Permit Application Addendum with every re-roofing permit. The form, revised January 2, 2025, asks 12 numbered questions about the old roof and the new one: how many layers there are and how many come off, the pitch, the number of squares, the flashing, the ventilation, the ice and water shield and the drip edge. Each answer is also a line a roofing quote should show. This article walks through those lines on an example roof, then works out the borough&amp;rsquo;s permit fee and the state&amp;rsquo;s deposit limit for an example price of $18,000. The &lt;a href="https://conshyroofers.com/guides/roof-replacement-price/"&gt;guide to what moves the price of a roof replacement&lt;/a&gt; lists the same items without numbers.&lt;/p&gt;
&lt;h2 id="the-example-roof"&gt;The example roof&lt;/h2&gt;
&lt;p&gt;The example is made up, with round numbers chosen for easy arithmetic. It is a plain gable roof, two slopes meeting at a ridge, on a house in the borough. Measured level, as on a plan, the roof is 40 feet along the ridge and 30 feet from eave to eave, including a 1-foot overhang on every side. The pitch is 8 in 12, meaning the roof rises 8 inches for every 12 inches it runs. It has one layer of asphalt shingles, and all of it will come off.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Worked example. The quote lines the borough&amp;#39;s roof permit addendum asks about, filled in for the example roof. The last column gives the question number on the addendum.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Quote line&lt;/th&gt;&lt;th&gt;In the example&lt;/th&gt;&lt;th&gt;How the example gets there&lt;/th&gt;&lt;th&gt;Addendum question&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Layers removed&lt;/td&gt;&lt;td&gt;1 of 1&lt;/td&gt;&lt;td&gt;The roof has one layer of shingles and all of it comes off&lt;/td&gt;&lt;td&gt;4&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Squares installed&lt;/td&gt;&lt;td&gt;14.4&lt;/td&gt;&lt;td&gt;1,200 square feet of plan area times 1.202 for an 8-in-12 pitch is 1,442 square feet&lt;/td&gt;&lt;td&gt;7&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Pitch&lt;/td&gt;&lt;td&gt;8 in 12&lt;/td&gt;&lt;td&gt;The roof rises 8 inches for every 12 inches it runs&lt;/td&gt;&lt;td&gt;6&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Shingle and warranty&lt;/td&gt;&lt;td&gt;Named product&lt;/td&gt;&lt;td&gt;Manufacturer and product line written out&lt;/td&gt;&lt;td&gt;5&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ice and water shield&lt;/td&gt;&lt;td&gt;43 inches up the slope&lt;/td&gt;&lt;td&gt;3 feet measured level from the eave edge times 1.202&lt;/td&gt;&lt;td&gt;11&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Drip edge&lt;/td&gt;&lt;td&gt;80 linear feet&lt;/td&gt;&lt;td&gt;Two 40-foot eaves&lt;/td&gt;&lt;td&gt;12&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Sheathing&lt;/td&gt;&lt;td&gt;1/2 inch at 16 inches on center&lt;/td&gt;&lt;td&gt;Replacement sheets priced per sheet before tear-off&lt;/td&gt;&lt;td&gt;3&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Flashing&lt;/td&gt;&lt;td&gt;Type and method&lt;/td&gt;&lt;td&gt;Written out for the chimney and walls&lt;/td&gt;&lt;td&gt;8&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Ventilation&lt;/td&gt;&lt;td&gt;1,022 square inches&lt;/td&gt;&lt;td&gt;1,064-square-foot attic floor divided by 150, in square inches&lt;/td&gt;&lt;td&gt;9&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;Torch-down work&lt;/td&gt;&lt;td&gt;None&lt;/td&gt;&lt;td&gt;The example roof is shingled and uses no torch&lt;/td&gt;&lt;td&gt;Hot work section&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.conshohockenpa.gov/media/3542/roofing-addendum.pdf" rel="noopener"&gt;conshohockenpa.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="squares-and-pitch"&gt;Squares and pitch&lt;/h2&gt;
&lt;p&gt;Roofers sell by the square. The addendum defines a square as 10 feet by 10 feet, or 100 square feet of roof surface, and asks how many squares will be installed. A plan measurement understates the surface of a sloped roof, so the roofer multiplies by a factor for the pitch. For 8 in 12, the slope is the square root of 8 squared plus 12 squared, divided by 12, or about 1.202. The example roof covers 1,200 square feet on a plan and about 1,442 square feet on the slope, which is 14.4 squares.&lt;/p&gt;
&lt;p&gt;A quote should state the squares installed. If two quotes give different counts for the same roof, ask each roofer how they measured.&lt;/p&gt;
&lt;h2 id="layers-and-sheathing"&gt;Layers and sheathing&lt;/h2&gt;
&lt;p&gt;The addendum asks how many layers exist, what they are, and how many will be removed. The borough allows a maximum of two asphalt, fiberglass or low-slope roofing systems, so a roof that already has two layers has to be stripped. A new roof cannot go over slate, wood shake, asbestos or clay tile.&lt;/p&gt;
&lt;p&gt;Sheathing is the layer of boards or plywood the roof is nailed to. The borough requires sheathing at least 1/2 inch thick over rafters 16 inches apart, and at least 5/8 inch with H clips, small metal brackets that join the panel edges, where rafters are farther apart. The roofer&amp;rsquo;s signature on the addendum certifies that decayed sheathing found after tear-off will be replaced with the owner&amp;rsquo;s written approval. The example roof has about 1,442 square feet of deck, or about 45 sheets of 4-by-8-foot plywood if all of it were replaced. A quote should give a price per sheet for replacement before the old roof comes off.&lt;/p&gt;
&lt;h2 id="ice-and-water-shield-and-drip-edge"&gt;Ice and water shield and drip edge&lt;/h2&gt;
&lt;p&gt;Ice and water shield is a self-sticking waterproof membrane laid at the eaves, where melting snow can back up under the shingles. The addendum requires it to reach at least 24 inches inside the exterior wall line. On the example roof, the overhang is 1 foot, so the membrane has to cover 3 feet measured level from the eave edge. On an 8-in-12 slope, that is about 3.6 feet, or 43 inches, measured up the roof. A quote that says only &amp;ldquo;one course&amp;rdquo; of membrane leaves the width open; ask how far up the slope it reaches.&lt;/p&gt;
&lt;p&gt;Drip edge is the metal strip at the roof edge that sends water into the gutter and away from the fascia board. The addendum asks whether it will be installed along every eave. The example has two 40-foot eaves, so 80 linear feet.&lt;/p&gt;
&lt;h2 id="flashing-and-ventilation"&gt;Flashing and ventilation&lt;/h2&gt;
&lt;p&gt;The addendum asks for the type of flashing and how it will be installed. It requires flashing to be rebuilt to the manufacturer&amp;rsquo;s installation instructions and metal flashing to be primed before any bituminous material, the tar-based kind, is stuck to it. A quote should name the flashing metal and say whether old flashing at the chimney and walls is reused or replaced.&lt;/p&gt;
&lt;p&gt;For ventilation, the borough&amp;rsquo;s rule is a net free area, the open area of the vents after screens and louvers, of at least 1/150 of the area of the space being vented. The space may have 1/300 instead when at least half of the vent area is high on the roof, at least 3 feet above the eave or cornice vents, and the rest is at the eaves. The example attic floor, inside the walls, is 38 by 28 feet, or 1,064 square feet.&lt;/p&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Worked example. Minimum net free vent area for a 1,064-square-foot attic under the two ratios on the borough&amp;#39;s addendum, rounded up to the next square inch.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th&gt;Addendum rule&lt;/th&gt;&lt;th&gt;Ratio&lt;/th&gt;&lt;th class="num"&gt;Minimum net free area (sq in)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td&gt;Standard&lt;/td&gt;&lt;td&gt;1 to 150&lt;/td&gt;&lt;td class="num"&gt;1,022&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;With high and low vents&lt;/td&gt;&lt;td&gt;1 to 300&lt;/td&gt;&lt;td class="num"&gt;511&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td&gt;High vents within the 1 to 300 area&lt;/td&gt;&lt;td&gt;At least 50%&lt;/td&gt;&lt;td class="num"&gt;256&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.conshohockenpa.gov/media/3542/roofing-addendum.pdf" rel="noopener"&gt;conshohockenpa.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;p&gt;When a quote names the vents and how many, ask the roofer for the net free area of each and add them up against the table. The addendum also asks whether the owner was told that inadequate venting may void the manufacturer&amp;rsquo;s warranty.&lt;/p&gt;
&lt;h2 id="the-permit-and-the-deposit"&gt;The permit and the deposit&lt;/h2&gt;
&lt;p&gt;The borough&amp;rsquo;s building permit application lists a residential fee of $50 for work up to $1,000, plus $10 for each additional $1,000 or part of $1,000. The application also lists a Pennsylvania UCC permit surcharge of $4.50. On $18,000 of work, the fee is $50 plus 17 times $10, or $220, and $224.50 with the surcharge. Torch-down roofing, a membrane softened with a propane torch as it goes down, needs a separate $75 operational permit, and the addendum tells the roofer to call the fire marshal&amp;rsquo;s office before work starts.&lt;/p&gt;
&lt;p&gt;Pennsylvania&amp;rsquo;s Home Improvement Consumer Protection Act, which names roofs among the work it covers, limits the deposit on a contract over $5,000 to one-third of the price, plus the cost of any special-order materials the contract designates. On $18,000, that is $6,000.&lt;/p&gt;
&lt;figure class="chart" id="chart-2"&gt;
&lt;figcaption class="chart-head"&gt;&lt;p class="chart-title"&gt;The building permit on an $18,000 re-roof costs $224.50&lt;/p&gt;&lt;p class="chart-subtitle"&gt;Worked example: Conshohocken residential building permit fee plus the $4.50 UCC surcharge, by price of the work, dollars&lt;/p&gt;
&lt;/figcaption&gt;
&lt;div class="chart-view chart-view-wide"&gt;
&lt;svg class="chart-svg" viewBox="0 0 720 340" role="img" aria-labelledby="chart-2-w-title chart-2-w-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-2-w-title"&gt;The building permit on an $18,000 re-roof costs $224.50&lt;/title&gt;
&lt;desc id="chart-2-w-desc"&gt;Bar chart with 6 points from 10000 to 30000, in Dollars. Series: Permit cost with surcharge ($). Values range from 0 to 345.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;line x1="72" x2="616" y1="234.0" y2="234.0"/&gt;&lt;line x1="72" x2="616" y1="162.0" y2="162.0"/&gt;&lt;line x1="72" x2="616" y1="90.0" y2="90.0"/&gt;&lt;line x1="72" x2="616" y1="18.0" y2="18.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="72" x2="616" y1="306.0" y2="306.0"/&gt;&lt;text x="64" y="309.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="64" y="237.5" text-anchor="end"&gt;100&lt;/text&gt;&lt;text x="64" y="165.5" text-anchor="end"&gt;200&lt;/text&gt;&lt;text x="64" y="93.5" text-anchor="end"&gt;300&lt;/text&gt;&lt;text x="64" y="21.5" text-anchor="end"&gt;400&lt;/text&gt;&lt;text x="117.3" y="324" text-anchor="start"&gt;10000&lt;/text&gt;&lt;text x="208.0" y="324" text-anchor="middle"&gt;15000&lt;/text&gt;&lt;text x="298.7" y="324" text-anchor="middle"&gt;18000&lt;/text&gt;&lt;text x="389.3" y="324" text-anchor="middle"&gt;20000&lt;/text&gt;&lt;text x="480.0" y="324" text-anchor="middle"&gt;25000&lt;/text&gt;&lt;text x="570.7" y="324" text-anchor="end"&gt;30000&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="83.3" y="202.0" width="68.0" height="104.0"&gt;&lt;title&gt;10000: 144.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="174.0" y="166.0" width="68.0" height="140.0"&gt;&lt;title&gt;15000: 194.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="264.7" y="144.4" width="68.0" height="161.6"&gt;&lt;title&gt;18000: 224.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="355.3" y="130.0" width="68.0" height="176.0"&gt;&lt;title&gt;20000: 244.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="446.0" y="94.0" width="68.0" height="212.0"&gt;&lt;title&gt;25000: 294.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="536.7" y="58.0" width="68.0" height="248.0"&gt;&lt;title&gt;30000: 344.50&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="570.7" y="53.0" text-anchor="middle"&gt;344.50&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="298.7" x2="298.7" y1="137.4" y2="124.4"/&gt;
&lt;circle cx="298.7" cy="144.4" r="3.5"/&gt;&lt;text x="298.7" y="120.4" text-anchor="middle"&gt;18000, 224.50&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;div class="chart-view chart-view-narrow"&gt;
&lt;svg class="chart-svg chart-svg-narrow" viewBox="0 0 360 250" role="img" aria-labelledby="chart-2-n-title chart-2-n-desc" xmlns="http://www.w3.org/2000/svg"&gt;
&lt;title id="chart-2-n-title"&gt;The building permit on an $18,000 re-roof costs $224.50&lt;/title&gt;
&lt;desc id="chart-2-n-desc"&gt;Bar chart with 6 points from 10000 to 30000, in Dollars. Series: Permit cost with surcharge ($). Values range from 0 to 345.&lt;/desc&gt;
&lt;g class="grid"&gt;&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;line x1="50" x2="276" y1="117.0" y2="117.0"/&gt;&lt;line x1="50" x2="276" y1="14.0" y2="14.0"/&gt;
&lt;/g&gt;
&lt;g class="axis"&gt;
&lt;line x1="50" x2="276" y1="220.0" y2="220.0"/&gt;&lt;text x="42" y="223.5" text-anchor="end"&gt;0&lt;/text&gt;&lt;text x="42" y="120.5" text-anchor="end"&gt;200&lt;/text&gt;&lt;text x="42" y="17.5" text-anchor="end"&gt;400&lt;/text&gt;&lt;text x="68.8" y="237" text-anchor="start"&gt;10000&lt;/text&gt;&lt;text x="181.8" y="237" text-anchor="middle"&gt;20000&lt;/text&gt;&lt;text x="257.2" y="237" text-anchor="end"&gt;30000&lt;/text&gt;
&lt;/g&gt;
&lt;g class="series s1"&gt;
&lt;rect x="54.7" y="145.6" width="28.2" height="74.4"&gt;&lt;title&gt;10000: 144.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="92.4" y="119.8" width="28.2" height="100.2"&gt;&lt;title&gt;15000: 194.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="130.0" y="104.4" width="28.2" height="115.6"&gt;&lt;title&gt;18000: 224.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="167.7" y="94.1" width="28.2" height="125.9"&gt;&lt;title&gt;20000: 244.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="205.4" y="68.3" width="28.2" height="151.7"&gt;&lt;title&gt;25000: 294.50&lt;/title&gt;&lt;/rect&gt;&lt;rect x="243.0" y="42.6" width="28.2" height="177.4"&gt;&lt;title&gt;30000: 344.50&lt;/title&gt;&lt;/rect&gt;
&lt;text class="label" x="257.2" y="37.6" text-anchor="middle"&gt;344.50&lt;/text&gt;
&lt;/g&gt;
&lt;g class="annotations"&gt;&lt;line x1="144.2" x2="144.2" y1="97.4" y2="84.4"/&gt;
&lt;circle cx="144.2" cy="104.4" r="3.5"/&gt;&lt;text x="144.2" y="68.4" text-anchor="middle"&gt;&lt;tspan x="144.2"&gt;18000&lt;/tspan&gt;&lt;tspan x="144.2" dy="12"&gt;224.50&lt;/tspan&gt;&lt;/text&gt;
&lt;/g&gt;
&lt;/svg&gt;
&lt;/div&gt;
&lt;figcaption class="chart-foot"&gt;&lt;span class="chart-note"&gt;Fee schedule from the borough&amp;#39;s building permit application packet, checked October 19, 2026. Torch-down work adds a $75 operational permit.&lt;/span&gt; &lt;span class="chart-source"&gt;Source: &lt;a href="https://www.conshohockenpa.gov/media/3534/building-permit-application.pdf" rel="noopener"&gt;conshohockenpa.gov&lt;/a&gt;&lt;/span&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;figure class="table-figure"&gt;
&lt;div class="table-container"&gt;
&lt;table class="table data-table"&gt;
&lt;caption&gt;Worked example. Permit cost from the borough&amp;#39;s fee schedule and the deposit cap of one-third of the price under the Home Improvement Consumer Protection Act, before any special-order materials.&lt;/caption&gt;
&lt;thead&gt;&lt;tr&gt;&lt;th class="num"&gt;Price of the work ($)&lt;/th&gt;&lt;th class="num"&gt;Building permit fee ($)&lt;/th&gt;&lt;th class="num"&gt;UCC surcharge ($)&lt;/th&gt;&lt;th class="num"&gt;Permit cost with surcharge ($)&lt;/th&gt;&lt;th class="num"&gt;Deposit cap at one-third ($)&lt;/th&gt;&lt;/tr&gt;&lt;/thead&gt;
&lt;tbody&gt;
&lt;tr&gt;&lt;td class="num"&gt;$10,000&lt;/td&gt;&lt;td class="num"&gt;$140&lt;/td&gt;&lt;td class="num"&gt;4.50&lt;/td&gt;&lt;td class="num"&gt;144.50&lt;/td&gt;&lt;td class="num"&gt;3,333.33&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;$15,000&lt;/td&gt;&lt;td class="num"&gt;$190&lt;/td&gt;&lt;td class="num"&gt;4.50&lt;/td&gt;&lt;td class="num"&gt;194.50&lt;/td&gt;&lt;td class="num"&gt;5,000.00&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;$18,000&lt;/td&gt;&lt;td class="num"&gt;$220&lt;/td&gt;&lt;td class="num"&gt;4.50&lt;/td&gt;&lt;td class="num"&gt;224.50&lt;/td&gt;&lt;td class="num"&gt;6,000.00&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;$20,000&lt;/td&gt;&lt;td class="num"&gt;$240&lt;/td&gt;&lt;td class="num"&gt;4.50&lt;/td&gt;&lt;td class="num"&gt;244.50&lt;/td&gt;&lt;td class="num"&gt;6,666.67&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;$25,000&lt;/td&gt;&lt;td class="num"&gt;$290&lt;/td&gt;&lt;td class="num"&gt;4.50&lt;/td&gt;&lt;td class="num"&gt;294.50&lt;/td&gt;&lt;td class="num"&gt;8,333.33&lt;/td&gt;
&lt;/tr&gt;
&lt;tr&gt;&lt;td class="num"&gt;$30,000&lt;/td&gt;&lt;td class="num"&gt;$340&lt;/td&gt;&lt;td class="num"&gt;4.50&lt;/td&gt;&lt;td class="num"&gt;344.50&lt;/td&gt;&lt;td class="num"&gt;10,000.00&lt;/td&gt;
&lt;/tr&gt;
&lt;/tbody&gt;
&lt;/table&gt;
&lt;/div&gt;
&lt;figcaption class="source"&gt;Source: &lt;a href="https://www.conshohockenpa.gov/media/3534/building-permit-application.pdf" rel="noopener"&gt;conshohockenpa.gov&lt;/a&gt;&lt;/figcaption&gt;
&lt;/figure&gt;
&lt;h2 id="what-to-do-with-two-quotes"&gt;What to do with two quotes&lt;/h2&gt;
&lt;p&gt;Copy the 12 addendum questions onto one page and fill in each roofer&amp;rsquo;s answer. A blank in one column is a question to ask before you sign. The contract&amp;rsquo;s specifications should carry the same answers, because the act bars a contractor from departing from the plans or specifications in any material way without a written change order, dated and signed by both sides, that states the price change. The &lt;a href="https://conshyroofers.com/guides/roofing-contract-requirements/"&gt;guide to roofing contracts&lt;/a&gt; lists everything else the contract must contain, and the &lt;a href="https://conshyroofers.com/guides/roofing-permits-conshohocken/"&gt;permit guide&lt;/a&gt; covers filing.&lt;/p&gt;
&lt;p&gt;If a quote separates special-order materials from the deposit, ask which items are special order. The act defines them as items that are not stock, are made or processed for that job, and cannot be returned for a refund or credit.&lt;/p&gt;
&lt;h2 id="caveats"&gt;Caveats&lt;/h2&gt;
&lt;p&gt;The example roof and the $18,000 price are made up and say nothing about what a roof costs in Conshohocken. The fee and the addendum rules are Conshohocken&amp;rsquo;s. West Conshohocken and the townships set their own fees and forms. Fee schedules change, so confirm the fee with the borough&amp;rsquo;s Licenses and Inspections office at 610-828-1092 before you budget for it. The deposit and change-order rules come from the state act as posted by the Attorney General&amp;rsquo;s office. For a dispute over a signed contract, ask a lawyer.&lt;/p&gt;</content:encoded></item></channel></rss>